Full roof contract completed , rear slope roofs re-slated with Cupa H3 slate and Leadwork replaced where instructed. All outer slopes re-slated using the existing scotch slate and shortfall brought to site.
The turret was fully re-slated whilst reusing the existing capping. Radius gutters replaced during to turret works.